The rehab of 1 track and the siding between FB and XR interlockings is well under way. Here we see equipment parked near the signal at Hamilton. |
Date:
12/13/2008 |
Location:
Fredericksburg, VA Map  |
Views:
150 |
Collection Of:

Kevin Olson |
|
Author: Kevin Olson
|
 |
Picture Categories: |
This picture is part of album: Christmas time on the RF&P |