CP Thompson Subdivision tracks in the foreground. Electric wires strung between the poles trigger signal lights if anything (e.g. a rockslide) contacts the wires. 0951 hours. |
Date:
5/19/2013 |
Location:
Gladwin, BC CA  |
Views:
525 |
Collection Of:

Kim Piersol |
Locomotives: |
Author: Kim Piersol
|
 |
Picture Categories: |
This picture is part of album: Thompson River Valley, British Columbia |