BH 1 crosses the Chenango River the day after a 12" snowfall. Its the first train across, and its knocking the snow into the river. The consist was typical at the time-one engine from everyone. |
Date:
1/9/1994 |
Location:
Chenango Bridge, NY Map ![Show Chenango Bridge on a rail map](/images/map_us.gif) |
Views:
255 |
Collection Of:
![This is one of your favorite contributors](images/star_yellow_small.gif)
Tom Beckett |
Locomotives: |
Author: Tom Beckett
|
![Cold day on the river](http://s3.amazonaws.com/rrpa_photos/107987/NYSW%201804%20north%20BH%201%20Chenango%20Bridge%2001091994.jpg) |
Picture Categories: Bridge,Winter,Signal,Action |
This picture is part of album: NYSW Northern Division |