The conductor that follows along in the truck already had the track set for the power to enter spur; it really makes for a super smooth operation |
Date:
12/7/2016 |
Location:
Pharr, TX Map  |
Views:
96 |
Collection Of:

Randy Curlin |
Locomotives: |
Author: Randy Curlin
|
 |
Picture Categories: Action |
This picture is part of album: South Texas Dec 2016 |