The conductor is aligning the switch so ELTX 7092 can be shoved onto its assigned track. Another railfan is also catching the action. OLD CNJ Station seen ahead of MA-2. The conductor is a very nice person and friendly to railfans. I have met him when railfanning here. |
Date:
1/11/2023 |
Location:
Bound Brook, NJ Map  |
Views:
84 |
Collection Of:

Steve Coraggio |
Locomotives: Rolling Stock: |
Author: Steve Coraggio
|
 |
Picture Categories: Roster,RollingStock,Winter,Yard,Station,Track,Action |
This picture is part of album: MA-2 Delivers Covered Hopper ELTX 7092 to Bound Brook Yard, Then Departs. |